PROJECT NAME: PIK – 104 - 3.79 (Over Sunfish Creek @ Confluence of Scioto River)
CLIENT: The Ohio Department of Transportation - District 9
PROJECT COST: $1,000,000
PROJECT DESCRIPTION: Three span steel beam bridge, 184’ long on T- type piers, featuring part-width construction. Bridge was widened and slightly raised to a new profile grade. Fatigue, remaining life, and flexural analysis were performed for the existing superstructure framing. Existing beams were used. T-type piers were modified and strengthened. Deck construction included closure pour. Abutments were modified to semi-integral abutments.