PROJECT NAME: MUS - CR - 35 - 5.30 (Dillion Falls Rd over Licking River)
CLIENT: Muskingum Co. Engineer
PROJECT COST: $1,200,000
PROJECT DESCRIPTION: Three span galvanized steel truss, with a corrugated steel floor-on-wall type abutments. This monumental structure carries Dillion Falls Road over the Licking River. At the time of construction, this bridge was the longest galvanized vehicular bridge in Ohio. E.P. Ferris & Associates performed the substructure design, roadway design and field surveys, and performed construction management & inspection services.